ON SITE UPDATE AND REVIEW STUDY (Annually if needed)
- Assess each reserve component’s condition based upon an on-site visual observation
- Adjust the Use Life, Remaining Use Life as needed based upon visual inspection
- Adjust Valuation Estimates of Repair or Replacement to current costs
- Update current reserve account balance and budget projections
- Update current reserve account earned interest rates and inflation factors
- Test the Current Fund Status and other Funding Plan using the Cash Flow Method
- Develop and recommend a practical Funding Plan
These Studies address the normal deterioration of properly built and installed components with a
predictable life expectancy. Catastrophic or events beyond reasonable predictability are not considered
as a depreciable factor in this report.