FULL RESERVE STUDY (Required Every 5 Years)
- Preparation of a Major Common Element Component Inventory in conjunction with governing
documents and State Statutes
- Determine Component Condition based upon an on-site visual observation
- Determine the Use Life, Remaining Use Life
- Determine the Valuation Estimates of Repair or Replacement
- Determine current reserve account balance and budget projections
- Determine current reserve account earned interest rates and inflation factors
- Test the Current Fund Status and other Funding Plan using the Cash Flow Method
- Develop and recommend a practical Funding Plan
These Studies address the normal deterioration of properly built and installed components with a
predictable life expectancy. Catastrophic or events beyond reasonable predictability are not considered
as a depreciable factor in this report.